A step-by-step guide to accelerating project delivery: Three 30-minute sessions on how UK water delivery teams are unlocking efficiencies on their projects.
Each session takes one thing that drains your programme: site visits, design reviews, pre-tender queries. We'll walk through how a real team fixed it so you can do the same on yours.
Every water delivery team is being asked to move more schemes through the same five-year window with the same headcount.
Most of the advice on offer is about strategy, this series is about the everyday changes to aid delivery. 

3 Episodes for 3 Stories:

  1. How to reduce site visits: from five assessments a week to 90 a day
  2. How to get every stakeholder on the same page
  3. How to get pre tender clarity for contractors

Register for episode three

October 7

How to reduce site visits

What we'll cover
  • What you can answer remotely and a triage method for site visits
  • How one company went from five assessments a week to 90 a day

  • Live demo and Q&A

October 21: 12:30-13:00

How to get every stakeholder on the same page

What we'll cover:
  • How to run a multi-disciplinary session that ends in a decision, rather than more questions
  • How to clearly present evidence for Ofwat / EA
  • Live demo and Q&A

November 11: 12:30-13:00

How to get pre tender clarity for contractors

What we'll cover
  • How to build pre tender packs without ambiguity
  • How to eliminate a contractor's guesswork on a buried-pipe 
  • Live demo and Q&A

Your Potential ROI: Calculate Your Savings

Use this simple tool to estimate the potential time and cost savings for one of your typical capital delivery projects.

sensat-stock-water-wastewater-treatment-aerial-1

Metric

Calculation

Cost per Assessment (A × B)
£0.00
Total Current Project Cost (Cost per Assessment × C)
£0.00
Your Potential Savings (Total Current Project Cost × 70%)